INDUSTRY / 03.04
Power — inspection and quality assurance
Combined-cycle and simple-cycle gas turbines, HRSGs, balance-of-plant piping, steam and water-treatment systems.
INDUSTRY FRAMING
Why Power buyers come to PSG
Power-plant owners need inspection that reads both the mechanical-equipment codes and the operational reliability picture. Our work covers construction inspection, pressure-equipment QA, and welding program oversight on gas turbine and HRSG projects.
APPLICABLE STANDARDS
The codes governing this work
- ASME Section I
- ASME B31.1
- ASME Section VIII
- ASME B31.3
- ASME Section IX
RELEVANT PILLARS
Services most often engaged in this industry
- Pillar →
Project Assurance
Owner-side oversight across the LNG capital project lifecycle. Regulatory compliance, construction inspection, and pre-commissioning support delivered by inspectors qualified to testify on what they witnessed.
- Pillar →
Vendor & Supplier QA
Source inspection at vendor and supplier facilities. We verify fabricated equipment matches your specifications before it ships, and that the supplier capability behind it is what was promised.
- Pillar →
Welding & NDT
Welding procedure development, qualification, audit, and inspection. NDT witnessing across radiographic, ultrasonic, magnetic particle, and dye penetrant. CWIs and ASNT Level II/III on the network.
REQUEST A PROPOSAL
Talk through a Power engagement
Tell us what you need. We respond within one business day with named project leads and a rough scope estimate. No discovery-call gauntlet.
